JVA, Stuttgart

Facts and Figures

DOWNLOAD PDF

This is the expansion of the detention space at Stuttgart Prison in Stammheim

For this purpose, three new prison buildings were constructed at the existing location. The service we provided was all fire protection and sheet steel doors as well as the shaft doors between the individual cells.

Execution period
July 2014 until December 2017

Client
Property and Construction Baden-Württemberg, Ludwigsburg Office, Karlsplatz 5, 71638 Ludwigsburg

Architect
Karl + Probst, Aldringenstrasse 4, 80639 Munich

Requirements
Fire protection T30 + T90, smoke protection, burglar resistance WK2, sound insulation up to 37 dB

Products
627 Fire doors 1- and 2-leaf and DIT doors 1-leaf.

Security
Burglar resistance WK2

Photo
Michael Tümmers