The new building for the Frankfurt/Main correctional facility, designed by the general planner Plan2 Architekten, provides space for around 500 prisoners, an infirmary, a transport department and the administration area
The SOMMER HRT detention room doors were used throughout the entire accommodation building. The doors have cost flaps and viewing windows with flaps.
This is an expansion of the Prison Frankfurt on the Main at the existing location
Three new detention buildings and a new gate with an additional administration building were constructed here. The work we carried out included all detention room doors and special detention room doors for the BGH areas.
Execution period
August 2008 until August 2011
Client
ARGE New Prison, Frankfurt on the Main (BAM Deutschland AG/ED. Züblin AG)
Requirements
Detention room doors (break-out resistance/burglary resistance) partly with sound insulation requirement
Products
599 detention room doors and 21 BGH doors
Security
Breakout/burglary resistance
Solution
Communication flap as revolving door, bolt monitoring at the detention room lock as reed contact VdS C